• Home
  • Documents
    • Lead Service Line Invent
    • 2018 CCR Filing
    • 2019 CCR Filing
    • 2020 CCR Filing
    • 2021 CCR Filing
    • 2022 CCR Filing
    • 2023 CCR Filing (Amended)
    • 2024 CCR Filing
  • Utility Information
    • Payment Portal
    • Application for Service
    • Master Rates & Fees
    • Septic System Requirments
    • TCEQ One Meter Rule
  • Permits
    • Vendor Permit Packet
  • Zoning
    • Zoning Map
    • Variance Application
  • Burn Ban Status
    • Outdoor Burning
    • Fireworks
  • Barstow Truck Route
  • More
    • Home
    • Documents
      • Lead Service Line Invent
      • 2018 CCR Filing
      • 2019 CCR Filing
      • 2020 CCR Filing
      • 2021 CCR Filing
      • 2022 CCR Filing
      • 2023 CCR Filing (Amended)
      • 2024 CCR Filing
    • Utility Information
      • Payment Portal
      • Application for Service
      • Master Rates & Fees
      • Septic System Requirments
      • TCEQ One Meter Rule
    • Permits
      • Vendor Permit Packet
    • Zoning
      • Zoning Map
      • Variance Application
    • Burn Ban Status
      • Outdoor Burning
      • Fireworks
    • Barstow Truck Route
  • Home
  • Documents
    • Lead Service Line Invent
    • 2018 CCR Filing
    • 2019 CCR Filing
    • 2020 CCR Filing
    • 2021 CCR Filing
    • 2022 CCR Filing
    • 2023 CCR Filing (Amended)
    • 2024 CCR Filing
  • Utility Information
    • Payment Portal
    • Application for Service
    • Master Rates & Fees
    • Septic System Requirments
    • TCEQ One Meter Rule
  • Permits
    • Vendor Permit Packet
  • Zoning
    • Zoning Map
    • Variance Application
  • Burn Ban Status
    • Outdoor Burning
    • Fireworks
  • Barstow Truck Route

City of Barstow Lead Service line inventory

Lead Service Line Inventory

About Lead service line inventory

Lead Service Line Inventory Requirements

 The Lead Service Line Inventory is an inventory of every service line in the City of Barstow distribution system, including both the utility owned and customer owned service lines. Each must be categorized as either lead, non-lead, galvanized requiring replacement, or lead status unknown. 


 

To develop our inventory, we review historical records to determine service line construction materials. An easy way to do this is to compare the construction date for structures within the distribution system to the Texas state lead ban, which occurred on July 1, 1988. If construction occurred after July 1, 1988, we may designate these service lines as non-lead.

Historical records reviewed include:

  • Construction and plumbing codes or ordinances.
  • County Clerk’s office or County Appraisal District (CAD) records to obtain construction dates of structures.
  • Water system distribution maps, engineering drawings, or capital improvement plans.
  • Water system standard operating procedures.
  • Historical records on each service connection and meter installation, such as maintenance records or work orders.
  • Inspections and records of distribution system.
    • Customer Service Inspection records
    • Customer Service Agreements

Additionally, we may need to conduct physical surveys and investigations to confirm service line construction material. 

Copyright © 2025 City of Barstow - All Rights Reserved.

Powered by

  • Payment Portal
  • Application for Service
  • Master Rates & Fees
  • Septic System Requirments
  • TCEQ One Meter Rule

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept

Due Dates

Bills are due the 15th of each month with cutoff for non-payment the 26th.  You may also access account information through the automated system (432)-287-7882

Pay Your Bill